October 28th-29th, 2008
Day One: October 28th, 2008
Time | Description | Presenters |
---|---|---|
7:00am | Visitor Badging (GSFC Visitor Center/Building 88) and Conference Check-In (Building 3 Goett Auditorium) | |
8:30am | Welcome and Conference Overview | Mike Kelly, Chief, Institutional Support Office, Safety and Mission Assurance Directorate, NASA GSFC |
8:45am | Goddard's Outlook | Rick Obenschain, Deputy Director NASA GSFC |
9:30am | Into the Future with the James Webb Space Telescope (JWST) | John C. Mather , Senior Project Scientist for JWST and 2006 Nobel Prize recipient, NASA GSFC |
10:30am | Enabling Mission Success: The Role of Goddard's Supply Chain Quality Assurance Program | Marcus Watkins, Director, Safety and Mission Assurance Directorate, NASA GSFC |
11:00am | Networking Break | |
11:20am | NASA Quality Assurance Policy: What's Working, What's New. | Brian Hughitt, Manager of Quality Assurance, Safety and Assurance Requirements Division, Office of Safety and Mission Assurance, NASA Headquarters |
Noon | Lunch Break (see listing of local lunch options) | |
1:10pm | Panel Session: Strategic Perspectives on Supply Chain Management | Facilitator: Jonathan Root, Associate Supply Chain Manager, Institutional Support Office, Safety and Mission Assurance Directorate, NASA GSFC
Panelists: |
2:45pm | Emerging Aerospace Requirements for Quality Management Systems (Aerospace Standard 9100) | Jack Fletcher, Senior Specialis, NASA Quality Initiatives, NASA Jet Propulsion Laboratory |
3:30pm | Networking Break | |
3:50pm | NASA Supplier Assessments: Processes, Results and Lessons-Learned | Facilitator: Roman Kilgore, hief Safety and Mision Assurance Officer for GOES R, Safety and Mission Assurance Directorate, NASA GSFC
Panelists: |
5:00pm | Adjourn for the Day |
|
Day Two: October 29th, 2008
Time | Description | Presenters |
---|---|---|
8:15am | Today's Agenda | Jonathan Root, Associate Supply Chain Manager, Institutional Support Office, Safety and Mission Assurance Directorate, NASA GSFC |
8:30am | Panel Session: Surviving (and Thriving on) NASA Supplier Assessments | Facilitator: Louis Thomas, Associate Supply Chain Manager, Institutional Support Office, Safety and Mission Assurance Directorate, NASA GSFC
Panelists: |
9:45am | Integrating Assessments of NASA Suppliers | - Buck Crenshaw, Deputy Chairman, NASA Joint Audit Planning Committee (JAPC) - Olga Ceritelli , Facilitator, NASA Audit Management Team (NAMT) |
10:25am | Networking Break | |
10:45am | Establishing Supplier Management as a Strength | Thomas Thrailkill , Director of Supplier Management, Boeing Space & Intelligence Systems |
11:25am | NASA Workmanship Standards: Policy to Compliance | Jeannette Plante , Manager, NASA Workmanship Standards Project, Safety and Mission Assurance Directorate, NASA GSFC |
Noon | Lunch Break (see listing of local lunch options) | |
1:15pm | Sourcing Authentic (Not Counterfeit) Electronic Parts | - Phil Zulueta, Group Supervisor, Quality Assurance Office, NASA Jet Propulsion Laboratory - Robb Hamond, CEO and President, American Electronic Resource, Inc. |
2:00pm | Risk-Based Supplier Assurance | - Robert Navarro, President/CEO, Quality Assurance and Risk Management Services, Inc. |
2:35pm | Networking Break | |
2:55pm | Supply-Chain Analysis for Space Exploration | - Michael Galluzzi , Supply Chain Management Lead for Shuttle Transition, Space Shuttle Program Office, NASA Kennedy Space Center - Ted Bujewski, Senior Project Engineer, NASA Headquarters Programs, The Aerospace Corporation |
3:35pm | System Failure Case Study: No Left Turns (United Flight 232) | Nick Tsui, Ph.D., Senior Scientist, Ares Corporation |
4:35pm | GSFC Tour Logistics and Closing Remarks | Mike Kelly, Chief, Institutional Support Office, Safety and Mission Assurance Directorate, NASA GSFC |
5:00pm | Adjourn Conference | |
** Special Thanks to ManTech SRS for graciously sponsoring the conference refreshments. ** |
Day Three: October 30th, 2008
Time | Description |
---|---|
9:30am | 9:00am Guided tour of GSFC's Visitor Center and Spacecraft Integration / Test facilities. The tour will begin at the Visitor Center (Building 88) and is limited to those signed-up and confirmed for the tour. |
Noon | End of Tour |